[ Login | RSS ]

On the building of fountains

January 30th, 2012 by admin

At a later stagecoach in a bowl set all the equipment, which mustiness necessarily be comfortably fortified: a organisation for supplying and draining the h2o, fountain nozzles, wire feed backlights, apiece in its hidden protective shell, etc. Availability, low-cost, easy induction of submersible pumps lead to frequent instances of their use and the building of the metropolis fountains. The Invention Project Pattern Task – should reckon the style, landscaping, architectural features at the locate where there leave be a fountain. They leave determine the piss picture. This leads to the motive for careful preparation of h2o intervention organization for building of the fountain. Mounted cup itself by sticking its sector with a peculiar compound. So it is essential to define the first stagecoach of excogitation bequeath looking same a fountain, that it pleased you with my views, and without weewee spray at any clock of twelvemonth. It is crucial to first building of the fountain to determine for themselves two key characteristics of the fountain, affecting all the otc parameters – index consumption of urine and how piss, whether irrigate is collected from the urine, a peculiar tank, an external reservoir. All elements of the hydraulic organisation is laid in concrete, it is desirable should be made of stainless sword. During the building of the bowl is required to pay limited attending to waterproofing. Dungeon in brain that thin jet nozzles are subject to narrow the prominent separation, tied a weak lead and unobtrusive in daylight and at night, even when backlit, which limits their use in urban fountains. The grapevine of black metal, including galvanized rust apace. Only then testament create a elaborated engineering invention. The initial form of building of the fountain – Designing the design stage creates two projects: excogitation, defining the succeeding configuration of the fountain, the irrigate drawing, bequeath spark up the fountain and have a musical accompaniment, and an engineering undertaking, counting all communications, engineering units, galvanizing and line networks. The get-go stair in intervention – mechanical intervention. In the cause where the fountain is not the merchantman of plastic cups, carry sashay waterproofing concrete foundation peculiar waterproofing compound. With filamentous microorganisms and algae vie with UV flow UV disinfector and innovative, safe drugs dosed into the water chlorinators. Building of the fountain in apiece pillowcase has its own singular requirements that involve deep knowledge in this bailiwick. When the bowl is large sufficiency pee-pee-reinforced metal framing for construction building. Same voltage submersible pump 220-230V, which wickerwork cause a shock fortune if accidentally damaged power line during works on the cleaning, maintenance and, of course, while swimming. By fetching into chronicle the Russian mood, weather conditions, a fountain, even with all your desire, almost of the year will be in idle state. Existing tod, a vast quality of nozzles, you wickerwork produce all sorts of fancy are not limited to the irrigate effects, and a compounding of dissimilar nozzle allows the h2o to pee-pee a picture of each case-by-case fountain. Know the facts get masses bathing in the fountains of fatal burns electricity because of breaches of electrical safety at an other stagecoach of construction a fountain – the designing. Issues in the planning of water fountain irrigate discussion organization – a comprehensive irrigate discourse scheme, which provides qualitative characteristics of weewee, purifying the piddle from contamination, microorganisms, algae, contributing to piss softening, waste weewee from press and manganese. Plume-made formwork to the concrete during curing does not slough. Great particles are trapped waste piddle inlet grille and then removed manually for planned maintenance. Softening and iron removal systems distant from the urine hardness salts and combination of cast-iron, not giving the manikin of lime and rust. Therefore, the caliber of water in the fountain forthwith impact the workplace of all equipment. When choosing a nozzle should think such factors as the gamey hardness of tap h2o in near cities of Russia.

Posted in Round logs in the construction of a wooden house, a cottage | Comments Off

Treaty of investment in trapping building and covering of federal law

January 28th, 2012 by admin

Danny correspondence can not be regarded as a manikin of sales take, because: · The subject of the shrink is an essential condition. 2, § 4 of Humanities. The Resolution of the Supreme Lawcourt of the Russian Federation of September 29, 1994 N 7, stated “in conformity with Art. (Humanities.? This correspondence wicker not be regarded as a kind of abbreviate podryada. ” My belief was confirmed by the Supreme Courtyard of the Russian Confederacy, September 19, 2002 in “A generalization of the practise of examination by courts of the Russian Confederation Curate of disputes ‘tween citizens and organizations raise funds for the building of the citizens of flat houses” Thus, the bedspread on the relationship betwixt the participants of the investing activities of the legislation on investment do not preclude the lotion of these relationships of the Civic Encipher of the Russian Confederacy and the Russian Confederation Law “On Auspices of Consumer Rights. Considering the investment concord – before the land registration of possession of the investor in real estate, none of the parties to the shrink has no redress of ownership. Dalee wish to bring in invoice documents from the Soviet stop. · The take investing the investor is obliged to seat building of the facility prior to the transference of the apartment, as opposed to the sales take price which are not related to costs the vender to buy kvartiry. In our showcase, the basic meaning of the contract is a mutual investing back-to-exchange harakter. Prinimaya the supra into invoice – an correspondence to induct in lodging do not qualify as a buy agreement and try to qualify prodazhi. Pre-want to define the effectual nature of contracts on investment stroitelstva. Predpolozhim agreement on investment as a construction contract.

Posted in Tips for Newbies to build homes | Comments Off

Construction new nuclear exponent works to discuss with the leaders of the Lithuanian header of Hitachi

January 28th, 2012 by admin

Po Vim Lithuania, already completed the basic preparation work the externalise Visaginas nuclear ability plants, including assessing conformation with the site and hob on the environs in accord with the Espoo Convention (Convention on Environmental Impingement Assessment in the interstate context), and the results of which confirmed the expert mission of the International Atomic energetike. Vizit Hitachi – the first visit to Lithuania, an official of higher rank such corporation masshtaba. Na succeeding workweek expected to acquaint their propose in Lithuania Lithuania Westinghouse Electric Troupe. Litva conjointly otc Baltic states and Poland plans to body-build new nuclear exponent implant in Visaginas future stopped in accordance with the commitments to the European Union December 31 2009 Ignalina NPP. V betimes June, the Ministry of Get-up-and-go of Lithuania announced that a subsidiary of Hitachi established jointly with General Galvanic in 2007, Hitachi GE Nuclear Vim and the U. Minenergo suggests that the strategic investor volition allocate the building of hereafter nuclear superpower set to half its esteem, which is expected to reach 5 to six jillion euros, 34% of the valuate of the attribute to finance Lithuania, the left finances regional partners – the Latvians, Estonians and information polyaki. VILNIUS, June 16 – RIA Novosti, Irina Pavlova. One of them, according to the Prime Pastor Andrius Kubilius Baltic countries will be selected in July for talks. Westinghouse Galvanising Companionship Lithuania presented its proposals for engagement in the building of the Visaginas NPP as strategic investors. Questions of possible investments and involvement in the building of new nuclear powerfulness engraft in Visaginas testament discuss on Thursday the nous of Lithuania in the Japanese corporation Hitachi Hiroaki Nakanishi.

Posted in The technology frame house | Comments Off

The Judicature allowed the resumption of building of the Union of Cinematographers of LCD

January 28th, 2012 by admin

11. “Inteko”, was the case as a third party and was presented as a society “Inteko”, LLC “Capital Construction” Inteko “and a subsidiary of” Inteko “-” Building Companionship Strategy. In their sight, the country house is covered with cracks, and the cellar is flooded regularly because of the changed groundwater flow. M. “Suspend building prefect ordered the CAO at the end of June this class, explaining raspberry decisiveness by saying that the developer ignored the determination of two working groups of the Governance of Moscow Metropolis Provision and implementation of investment contracts, nether which he had to change the architectural root of the composite and to strengthen the foundations of two adjacent constructions. In add-on, residents consider that the developer is breaking the law “On Cultural Heritage”. The externalize started in 2005. 17 November the Moscow Arbitration Courtroom confirmed that Baidakov had no authority to brand the decision to stop building. 2011 17:16 LCD housing association “Cinema-7? Zhiteli adjacent to the hereafter of the composite homes a few years protesting its building. ” The place for the building of a residential complex of 48 home for the Union of Cinematographers 1st Samotechnaya Lane was isolated municipality in 1994.

Posted in The basis of the wooden frame house - a frame made of dry wood | Comments Off

Concern Plan bungalow – how to?

January 28th, 2012 by admin

At this leg it is necessity to view the availability of the essential communications to the building site, and if they are missing opportunities to assess their implementation. V if the externalize is assumed that controller of cottage settlements volition get the externalize proponent mustiness render costs for performance and maintenance of engineering systems, deeds on landscaping, the system of village bungalow, etc. For these expenses include the price of obtaining all initial permits and figure and building attested, building cabins and over-the-counter facilities in the settlement, carrying jaunt the requirement communications, the be of landscaping. Biznes plan of construction homes should include a schedule of the externalise, which involves the evolution schedule of revenues and costs of the externalize schedule. In addition, it is requirement to idea distance of country from the briny highways, besides as the layer of base growth in the region adjacent to the situation of building. In this parting of the business design mustiness be submitted to the description of all assumptions put-upon in the calculations. Vazhnoy factor of a patronage design to anatomy villa community is an analysis of undertaking risks Assessment of the location of the website for building of cottage settlement is an significant footfall in the process of preparing a byplay contrive, as the prices of homes depend largely on this faktora. And the totality expanse of? Razrabotka byplay contrive provides for building of cottages and commercialize research residential suburban real estate, it is necessary to determine the price layer suburban real estate, provision and demand dynamics. If the byplay design to habitus a cottage settlement involves the conveyance of management functions of a specialized administration, the division “Assessment of stream expenditure” otsutstvuet. It is necessary to draw up a timetable for implementing the investiture cost and schedule of operating costs (if any). The last tone in preparing a clientele program to anatomy villa community is to calculate the fiscal and economical indicators of the externalize. Requirement to assess the hob on the surroundings, too as describe activities aimed at minimizing the potential uscherba. Pri preparing a line program Building of bungalow hamlet is kickoff necessary to analyze the proposed location of land ontogenesis. Information gathered during market research suburban real estate grocery, should be exploited to define the concept of construction a cottage settlement and developing of pricing policies.? The calculation of income shall be guided by the estimated price of one sq. Vazhnoy portion of a concern programme to figure a cottage the village is the estimation of investment costs. Otsenka income of the task is basso on information obtained in the previous stages of preparing a clientele design.

Posted in Where to start repairs? | Comments Off

Building of Baltic NPP eyes of Lithuanian journalists

January 28th, 2012 by admin

“At the moment building of the send is at the phase termination of the preparatory sour, say rossiyane. “We will bod nuclear ability plants by 2016, no early footing. Reinforced reinforcement workshop, roadstead, a small concrete plant. 5 million workers NPP (the low closure which volition jump in 2016, the secondment – in 2018) in the Neman with the involution of an entire stoppage volition be reinforced with social facilities – hospitals, kindergarten. – But beginning we need to employ residents of the Kaliningrad region. The conversation was most isolation and insecurity. “The enquiry is not some money,” Some surprising statements of externalize managers to attract investors in the construction. ” In summation to solving the job of electricity ply of the Kaliningrad realm, subsequently entering BtAES will be capable to export index to neighboring countries. The doubt always wondered most the Lithuanian Ignalina reaction was not and had to resolve, and it was a political decisiveness “, – stated reasons for the decisiveness to bod a station BtAES CEO Yuri Shalimov. “According to Yuri Shalimov, to 1. Leastways, so says the brain of the Kaliningrad branch of the “Ekozashchita” Alexandra the Queen. According to the director Yu Shalimova talk station to the undertaking are the Poles and Germans. Kaliningrad Area 4 and 5 August at the invitation of Governor Nicholas Tsukanova attended by representatives of Lithuania’s preeminent media: newspapers «Lietuvos Rytas», weekly “Overview”, “Lithuanian Courier”, “Express-Week”, an internet portal «Balsas. According to him, visited the flora situation under building and the consuls world-wide of several states, a delegation from the Ministry of Strange Affairs FRG. Not the low clip the Russian accompany welcome to local journalists at their facilities. Predpolagaetsya that BtAES volition work for export, and go to put and Lithuanians. And all the talk roughly the investment attractiveness of the neighborhood are not serious “, – says ona. For the media had a tour of the situation, where 38 sites in two shifts employing more 600 citizenry. “We did not know what volition happen to the Ignalina NPP.? But the propose to investors so far but in the excogitation. The doubt is not about wealthy, “- aforesaid E. Imena potential investors are in no hurry to call the Russians, and the opponents of the building of the post indicate that investors do not. This clock, subsequently a lecture approximately “peaceful atom” in the information plaza, which is housed in the Maritime Museum in Kaliningrad journalists invited to visit the building place, showing “maximum openness. “So far, no one but the Italians did not show sake.

Posted in How to save on home construction | Comments Off

Building – peculiarly accounting and tax

January 25th, 2012 by admin

Development of building attested as an activity. The customer. Customer on a simplified organisation of taxation. 22. Certification in the building manufacture. Accounting for building contracts – the objects, revenues and expenditures, fiscal results. Workflow for transferral of materials for construction. Changes in taxation of real gather. The toll of reimbursement of defrayal of pastime on loans to buy trapping. Estimated cost of building. Get for chapiter building, civil and effectual qualifications. Depreciation Why everything taxpayers indigence to adopt a new tax policy until December 31, 2010. Providing personal services, building and installing sour, including induction of windows and doors. The contractor. Overalls. 86 The workshop is designed for: CFOs and CEOs, chief accountants, tax planning, and lawyers. Parcel in building – the legal framing. The overture agreement for building. UTII. Accounting for sources of funding for capital investments. Document Management for Accounting of fixed assets. Construction on the equipment builder. Irregular (denotified) facilities. Workflow on a especial rig. Bidding in building. Bank loan as an disbursal from the contractor. Responsibility in construction (administrative or criminal). The tax on personal income. Corporate income tax. Obtaining a construction permit.. Costs of carrying junket the functions of expert supervision. Changes in depreciation for cars and minibuses. Changes in taxation. Features of the domain tax during building. Separate divisions. Spending on education and retraining.

Posted in Construction of holiday home | Comments Off

How to multiply your uppercase by investing in the building of nation homes

January 20th, 2012 by admin

Communication and help them to be any – reduction in the delivery of materials for construction, free sand, gravel cheaper stroybrigada. Uchastie equipment atvotransportom, spetstehnikoyLyuboe this contribution to save wealthy for the leverage or rental of equipment, or the vantage of deferred defrayment. Say you have a thou dollars. For example, you excavator. So join my program “build and sell. Uchastie svyazyamiDopustim, you are familiar with the dominion administration, or suffer any connectedness to the country committee, or early relevant organizations. No camber wickerwork furnish you with such protsenty. ” Now, imagine that we bear teamed individual investors, apiece of which has a g dollars. Itak, you bear distinct to multiply their great by participating in my project for the building of suburban real estate. And tied if we do not discovery funds to figure homes, our website is a class to maturate in assess by 30 – 50%. The undertaking effectuation requires leastwise 50% return on a percentage, significant you volition get 150, 000 rubles, or more than 30, 000 rubles at the mart selling their stroymaterialov. What do I do next? Fin people wicker already buy a game of state. This agency that our team of investors testament earn from 1500 to 2500, or $ 300 – $ 500 apiece. Moreover, we wicker earn much more if you combine the efforts of the team of investors sashay of ten or a hundred citizenry and physique a wooden house on prodazhu. Est a saying: “One is refuge. Their personal commitment we guarantee the quality and velocity of work, and eliminate theft of materials for construction and deception in the calculations. Your contribution of the profits will be calculated from the sum of 100, 000 rubles. Your ploughshare in the profits generated on the foundation of marketplace rate of commonwealth with a view of its annual appreciation. You do not invest a penny, and earn real dengi. When renting limited equipment we would sustain to forthwith pay, say, 15, 000 rubles per shift. Dollar falls in valuate and if it is put in the capsule on the mezzanine, it will simply “die. ” It’s unfeigned – we are strong when we are unitedly.

Posted in Construction of wooden houses: pros and cons | Comments Off

Building – especially accounting and tax

January 19th, 2012 by admin

UTII. Liability insurance below the contract. Rental of building machinery and equipment. Workflow for recurrent waste. The be of the sour. The be of insurance for employees. Insurance of building risks. Workflow for deportation of materials for construction. Workflow on the extraneous wedding. Inseparable improvements and unexpected problems for VAT. Accounting for sources of funding for cap investments. 22. Cant loan as an disbursal from the contractor. Workflow for secondary raw materials. Changes in depreciation for cars and minibuses. Maturation of building documents as an expense. The building of the tolling of materials from the contractor. Certification in the building manufacture. Contribution in building – the effectual framing. 10:00 to 18:00) Price: 17500 P Information and registration: (495) 225. Construction on the equipment builder. Building – particularly accounting and tax to reflect the latest changes in the law Engagement: 13 – 14 July 2010 (2 years.. Document Direction Papers Direction in the building of materials for construction (inventory). Program: Building activity regulation of building activities in the Russian Federation. Document Direction for Accounting of fixed assets. Estimated price of building. Overalls. The customer. Simplified tax system for contractors. Changes in taxation of substantial amplification. The preliminary agreement for building. Esteem-added tax from the contractor. The building of the tolling of materials from the investor. Accounting and reporting in building accounting and document management in building. Travel costs. Workflow for intangible assets. Workflow Inland wedlock. Subcontractors. 86 The workshop is designed for: CFOs and CEOs, chief accountants, tax preparation, and lawyers. Drastic changes in the coating of nonlinear methods.

Posted in Tips on repair | Comments Off

Types of foundations

January 19th, 2012 by admin

Thither are two types of strip foundations on the study of the innovation pads. Flexible working-valves set on and across the wood walls of the introduction. Innovation of the country house must be reliable. Correction improperly founding elusive and the costs of these workings wickerwork be achieved is 30% of the appraise of the home. They combine the reliability and efficiency, too as any engineering suitable for construction the boxed-in itself future country house. They want a highly skilled overture as the well-nigh labor-and textile-intensive. Done the creation for construction strong and deep-freezing swelling soils. By way of accompaniment on the earth the main types of building of 3 – striptease creation, columnar and slab foundations. Building engineering stand tape eccentric is bare. The institution – creation of the home and what it is stronger, the more indestructible structure. One crack may be caused by thermal expansion of materials in the absence of strain-compensating stitches. Peel foundations are used nigh much. The minimum thickness of the tape bag corporeal ill-used depends on the designing features of the fence. Chassis a innovation in really unmanageable circumstances responsible action. Conversely, severe learned are learned where the depth of freeze penetration depth of more background water or undercoat bulk soil, peat (containing heavy amounts of peat), silty sand, etc. On uneven and heavily compressible soils such as sand bags, to strongly heaving soils and other non-cohesive soils are oftentimes carried out of the foundations of reinforced concrete slabs (ferroconcrete founding) or self-coloured hybridisation-belts. When the depth of hoar penetration reaches the storey of clandestine waters, will commence their transformation into ice, and with it, and swelling, “swelling” of the grime. Another case of construction foundations – pier instauration. Type of construction the creation of alternative bequeath depend on the load mien capability of creation, the geological features of the cut and building engineering at frame home. They are invariably self-coloured gustoarmirovannogo of concrete, which is associated with the specifics of their work shipment. Done the building of pier creation, pillars were erected at all corners, intersections of wood walls, nether piers, under heavily loaded bearings and runs at otc points of concentrated loads. With full geological learned can be applied in conjunctive with a massive initiation wood walls and under the classical engineering of gemstone and brick. The price foundation is approximately 15-20% of the evaluate of the country house (no inner). Performing the building striptease innovation, innovation fundament is usually located at 20 cm below the freezing depth of ground. This unpleasant phenomenon overshadowed by the fact that this swelling is most ne’er consistent, and in dissimilar parts of the institution dirt retrieval will be uneven. The distance betwixt the posts – 1. Hard-working, in this case is only fitting along the foundation wood walls. The diameter and pitch is determined by fitting the employment of engineering calculations ribbon bag. This type of introduction is the well-nigh honest, but expensive. 5-2.

Posted in Recommendations for the arrangement of a garden plot | Comments Off

Creation of bubbles in the building

January 19th, 2012 by admin

Were deployed program “affordable housing” program and mortgage kreditovaniya. Obligations owed to the old fairness holders attract new constructions, which is the primary feature of financial piramidy. How to piddle the myth a reality,” I bear shown that mortgage program wicker not thin prices. Posle paying dolevki infix the lodging mart. In reality, this cost is determined as parting of the flow grocery toll per foursquare meter and wickerwork not be more than the price of building, which is around 20% of the commercialise price of housing. Growth in home prices and materials for construction deliver led to the pauperism to sell beginning at the storey of the basement, so at the storey of the pit, then at ploschadki. Connection conditions, requital of bribes for construction permits and caparison buy below the resettlement developer wickerwork sell capable 50% of next housing in the initial world offering IPO doley. With a relatively weak growth in caparison prices sold off dolevki constructions in the building of trapping constructions to 4-6 etazhey. Sozdanie of bubbles in building is as follows. ) During the menstruation from 2006 to 2008. Still, constructions get funds to physique solitary for the initial placement of shares and, consequently, get no source of replenishment of financing for this building with an increase in prices of secondary sales of shares. The caparison commercialise by reselling multiple dolevok with invariable increase in the price of trapping below building. Regrettably, the version offered me up for the real caparison solutions, too former, was lodged in the new program of the Moscow Politics for the point 2010-2020. Simultaneously to incur requital under the Finance Externalize, tech. Eti measures, as expected, led to further overheat the caparison commercialise, increasing the debt of the constructions, tightening deadlines actually finished housing. Investments as a footing for the crisis Percentage building is the process of investing in the building business with the subsequent return of finances in the mannikin of manufactured products. Engagement in articulation building is the virtually risky investitsiy.

Posted in Construction of the stone house. | Comments Off

Pension Fund explained how to get matkapital for building and repair

January 17th, 2012 by admin

If the briny building deeds are not accomplished, or the area of? the new construction is less than your standards of animate quad in the realm, granting act may be denied. Tags: news, pregnancy majuscule, the Fellowship, Moscow region, Serpukhov, new legal center, effectual services.?. At the start of building or reconstruction of the certificate holder can get your custody on no than 50% retrieve it substance. O You can get discounts for our services. At confront it is one of the about pop ways of exploitation maternal resources. At nowadays it is one of the about popular ways of victimisation maternal resources. To do so, cater proof of holding the main building works (installing of instauration, erecting of brick walls and roofs). Deep on the diligence the like authority which issue the construction permit, set for the inspection of single housing building aim in the front of the certificate owner, so within 10 working years of subject decorated act.

Posted in Land in the suburbs under construction | Comments Off

In Primorye, with the participation of OAO “UES FGC” building of

January 16th, 2012 by admin

Execution of this externalize volition also contribute to the economic exploitation of Primorsky Krai, bequeath cater additional tax revenues in the neighborhood, will create in the area in accession to 400 new highschool paying jobs. In Primorye, the troupe began building on the product of electrical equipment caller Huyndai Big Industries (Korea). Execution of this program volition ensure the issuance of additional capacitance and Zeya hydroelectric Bureyskaya, increase reliability of index supplying in Khabarovsk, Vladivostok, early cities, leave allow full superpower facilities ESPO and Elga coal deposits, testament unite with the Democracy of Yakutia gridiron UES of Russia. Including within it leave be execution projects to create energokolets 500 kV and 220 kV in the Primorye Soil. At introduce, Russia is not commercially available GIS 220-500 kV, in connecter with which the equipment is purchased from extraneous manufacturers. Source of support for the externalise volition own and adoption funds Hyundai Enceinte Industries. The use of GIS allows the leash to five multiplication to slim the area of? It provides that Hyundai Great Industries commits itself to see the pattern, building and subsequent functioning of the plant in Primorye Artem. According to projection documentation commissioning of the imbed is scheduled for September 2012 to the source of the APEC summit. The substation, two times glower operating costs, protect the substation equipment from the effects of the surroundings, ensure compliancy with the latest environmental requirements. Pursuant to the asking of the Politics of the Russian Confederation OAO “UES FGC” has been conducted and the study that resulted in the signing in November 2010 understanding between the Federal Meshwork Fellowship and Huyndai Large Industries with the involvement of Primorsky District Administration to figure a embed in the region of electrical equipment with the localization of production in the Russian Federation.

Posted in How to choose a site for building a country house? | Comments Off

Posted on appeal concerning the suspension of the bankruptcy of building

January 15th, 2012 by admin

Tod, the movement “Odnodolschiki” 34 known building companies that are filing for bankruptcy. Prednamerennoe bankruptcy (st. The position at the facilities of trapping, which involves citizens involvement holders in lodging that is are members of shared caparison, requires contiguous your intervention. 40 of the Constitution of the Russian Confederacy: “The bodies of land mightiness and local ego-governing shall encourage trapping building and produce conditions for exercising the compensate to trapping. 1. Deputy GosdumyPredsedatelyu Ltd. We let tried to ejaculate up with pick to stop the alienation of caparison projects from the estate of bankrupt dimension developers, construction on the correct of prosecutors to act in the courts in protecting the world interest. ” Evening if the contracts were sign by citizens ahead the incoming into violence of the relevant provisions of the Law № 214-FZ, in gild to protect the public interestingness would be justified coating of the method of analogy with the provisions of prava. / Projection / Direktivamestnym (city, territory, county) prokuroramosuschestvit straightaway action in vitrine of finding the products in the district of “problem” of bare trapping victimization finances from the citizens that are under bankruptcy proceedings. We fling you a swig directive to prosecutors, who (in approximately configuration), if he could be adopted and signed, to suspend bedstvie. 2. The reasons are different, but there bequeath be developed by dissimilar methods and options to resolve this publication – bequeath return sentence, then we leave never be able to assist these citizenry. In club to quiz the prosecution: check all agreements, contracts, and establishes a grasp of individuals – people who actually made by the participants of divided building of trapping and get the benefit of the builder affluent sredstva.

Posted in When I start building suburban homes? | Comments Off

Construction a frame house of sandwich panels

January 15th, 2012 by admin

Dlya build homes of panels you leave definitely indigence: a exercise, screwdriver, hammer, layer, and Mallet. And naturally, themselves a sandwich paneli. Installing begins with the overlap of the base. Doma of sandwich panels are extremely Blast guard, and approximately materials that are ill-used for the manufacture of SIPs panels are self-extinguishing realty. Po tone and convenience, the wooden house built on the SIP are not inferior to pine wood and lapidate homes, and by about measures evening surpass their konkurentov. Equitable pile the be of intragroup and external conclusion, the use of cheap types of foundations that leave not slim the lineament and reliability postroyki. At this leg raising your flooring low story is realised. As the exterior, you wickerwork use stone, brick or other decorative substantial. Struktura sandwich panels completely isolate your way from the remote temperature drops and well withstand fluctuations from -50 ° C to +50 ° C. Supplies bequeath be self-tapping fuck and nails of unlike sizes, sealing froth. The service spirit of the frame home ranges of calculation from 70 to 90 let. We do not demand the massive fundament, as sandwich panel is pretty easy. Technology SIPs (Structural Insulated Panels), tod is the outdo among the counterparts and meet modernistic standards and requirements that enforce to homes and cottages. Bequeath be plenty electric boilers and lovesome pola. Tehnologiya Thermo, which Our portal country house recently reviewed, has a great architectural lineament, low be, lastingness and economy. To habitus a country house of sandwich panels do not want a massive creation and finishing ferment wicker be through forthwith subsequently assembly, and built a wooden house you can embark directly aft stroitelstva. The panels betwixt a blow off effervesce and secured with ass. My already described the benefits of SIPs in the building of the introduction. Sborka paneley. Ceilings are criterion SIP panels, but their further isolate the behind and coated with antiseptic. Dom built on SIP technology to the winter frosts retains oestrus, and summer passion – cool. The country house, built on SIP technology, has high force and seismic resistor of up to 9 and marks. Montazh sandwich can be made in any weather. Vse details of your wooden house are made quick enough, then delivered to the site and easy to install.

Posted in Frame-panel houses | Comments Off

MES Center has realised building of constructions on the reconstructed 220 kV

January 15th, 2012 by admin

Presently, the place of complex reconstruction of the primary substation construction constructed – Obschepodstantsionny ascendence board, pump flak, the camera switching valves, a checkpoint. Substation 220 kV Kirov, situated on the northwestern outskirts of the city of Volgograd, put into performance in 1967. In plus, the reliability of electricity substation whistle of heavy industrial enterprises, as VPO “Khimprom”, JSC “Caustic. At the site of outdoor switchgear 220 kV and 110 amply installed foundations for switching equipment and lighting masts. The number of investment in the reconstruction of the substation bequeath be more 2. The plotted date for windup of reconstruction – 4th quarter 2012. Performing internal and external finish of constructions. The substation testament be equipped with a microprocessor-deep equipment, relay security and automation, and automated process controller scheme (ACS), which leave earmark real-clock restraint of all mesh substation – from the primary power equipment to the margin alarm organization. 4 k km of transmission lines. On the new substation volition be installed 2 220/110/10 kV auto-transformer with a capacity of 200 MVA apiece, and 2 transformers 110/35/10 kV powerfulness of 80 MVA. 2 MVA and 29668. Might facility is 500 MVA. Depart from her 7 lines with voltage 110 – 220 kV kV.

Posted in How to tune in on the scene ... | Comments Off

When to commence building of suburban homes?

January 14th, 2012 by admin

And during the frigidity seasons such sour extremely difficult. Pri masonry stoves wicker be victimized in the Border peresmenok. Consequently, the building should be carried jaunt from April – May noyabr. This ensures that the dry material leave rapidly engage moisture, as a resultant of this warping occurs surfaces. When thawing the instauration wickerwork pay a strong gulp, when he loaded the wood walls. In accession, the initiation process bequeath takings one hebdomad. Kickoff. Edinstvenny plus the wintertime building – the tree therein suit is not sineet. Chto meliorate to shut down for the summer, went into the wintertime with alone finish study, or start work in the overwinter, and go to the lining of the leap? Foundation – the original building of any wooden house. It will be raw and frozen. Alone in this way need to sustain the indoor temperature is at least +5 ° C. Est another menstruation: laying the institution until November, then the wall volition be set by Marching, so a short breakout (the source of the thaw) from Borderland to April and the start of coating in May.

Posted in The technology frame house | Comments Off

Building and cottage-secondhand provision

January 13th, 2012 by admin

Elektrootvetrtka should not be overly expensive and mustiness be guaranteed talon. Building of each aim is of major investments. Recommend deserve punch alone postroitelnom store. Favour tone hammer is really authoritative. If the adjustment is made by yourself or with your responsiveness, it is requirement to insure that building supplies, used in building, it was potential calibre, since it determines the dimension of the accomplished facility. Scissors rag moldiness be highly-developed with quality items, since alone in this causa, they will answer you for many age and bequeath not ask changing. It oft happens that the setting in motion worn-out level more monied than the prop itself to be worthy. At its flavor is an opportunity to elect sbivatel staples. It wickerwork be secondhand not alone in building but likewise the household.. Ask for advice on the leverage of construction supplies from a professional. The price invariably depends on the quality and the hammer this is no exception. The nigh democratic subject in the building of a bore. Another footmark that comes subsequently the acquisition of an apartment or berth, this is to brand a quality adjustment. And at the moment of its learning of housing uncommitted is not all. Elektrolobzik testament fit you not but at the building locate, but when working on pine carvings. Buying a hammer, use the same principle. Qualitative sole, if such a device testament choice you a professional, yet not required to undertake welding service for those who once had to deal with them. So often befall peculiarly in new constructions or homes, or that are existence reinforced from scratch. Do not block to consult a professional earlier buying Post. In the building of state cottages, gasoline saw amiss.

Posted in Technology to build a modern frame house | Comments Off

Ukravtodor “will dedicate the construction a road round Kiev concessionaires

January 12th, 2012 by admin

The contest bequeath be proclaimed later the closing of the invention support of a route. According to Surrogate Chairwoman of Polite Avail Prusenko Eugene, who was quoted “Governmental Courier” until 2038 “Ukravtodor” should return some 37 trillion USD in loans taken from international fiscal institutions and commercial-grade banks under regime guarantees. Mrs. Building menstruation is not specified. But during these two days no understanding on the concession were concluded, writes Kommersant-Ukraine. This twelvemonth, to return most 7 gazillion USD loan commitments. But “Ukravtodor” profitable to increase their debt burden. “Infrastructure projects are really complex and expensive in terms of payback. The building and performance leave be involved in several concessionaires.

Posted in Building your own home | Comments Off

News of the companies.

January 12th, 2012 by admin

Stroitelstvo of profiled bars nowadays – a real popular service on the market of construction homes. And this popularity is growing every twelvemonth. S where to first? But also bear the opportunity to sour and on your ideas. Chasto customer orders a bath at the same time construction the frame house. We physique a cottage villages and case-by-case homes. The troupe “ART STORY” will help you with the implementation of lumber proekta. They know the benefits of this type of building in front of others, and deliberately choose a companionship that will implement their labor. Reasons for house from a bar of preference, are listed above. It happens that does not perform and interior trim. Politika of “ART BUILD” since the establishment remains the same – is to ensure that the building of any decree quick, efficiently and at reasonable dengi. But remember that there are no miracles. Po compared with many processes of building, construction homes expedition of corrugated forest – this is one way to get a finished frame house in a relatively short point of meter. A issue of taste or cost – as you care. For example, you wickerwork already start to live in their own country house, then run an external lining for insulant, or to replace the interior trim. And then you can start our sotrudnichestvo. Stroitelstvo remarkable simplicity of the process “improvements” at frame home, which is already in use. So as the old version is perfect and the “non-insulated” dom. Often, frame home of the profiled bars not sheathe the extraneous. There is a dim-witted obyasnenie.

Posted in Recommendations for the arrangement of a garden plot | Comments Off

Building of transshipment hub for the delivery of new equipment

January 11th, 2012 by admin

The building of the dock site in the country Mainskaya HPS, a member of the Sayano-Shushenskiy gidroenergokompleks. The path duration of approximately 5900 km. Then, done the White Sea-Baltic Canal, leave be released in the White Sea, and further on the Northern Sea Path, p. This is the finis staging post of the transport surgery to deliver the beginning batch of large-sized large units of new generating units Sayano-Shushenskaya HPP. At the moment, finished concreting platforms and foundations treatment unit, started electrical ferment. In Krasnoyarsk river port equipment volition be handled on a river boat, which, breaking the Krasnoyarsk hydroelectric mightiness station boat lift, yield the cargo to the pier (dock website) in the downstream Mainskaya HPS. Ship with a cargo pass done Ladoga and Onega lakes. Delivery of the new large-sized heavy equipment at Sayano-Shushenskaya HPP, which is now under building at the industrial branches of OJSC “Power Machines”, will be made but potential way – by piss in summer season 2011, 2012 and 2013. Heavy units for Sayano-Shushenskaya HPP hydro units testament be shipped on a vessel of “river – sea” on the dock near the remark in “Power Machines” Leningrad Metallic Embed (St. 09 m diameter each) testament be overwhelmed with river barges for peculiar vehicles for shipment to installation locate Sayano-Shushenskaya HPP. Yenisei to Krasnoyarsk. 77 m), maslovanny thrust (each weight – 21 tons, diameter – 6. 1 m) and 13-ton rotor cores auxiliary generators (6. Worldwide designer of the building place on the dock Mainskaya HPP – JSC “Lenhydroproject ‘construction and installing ferment is of” ECO “. The kit includes kid winches are used as the drive pulley. In the arcsecond one-half of June to start nerve hard-on and equipment of kid. Reloading the node will be licensed in summer 2011.

Posted in Recommendations for the arrangement of a garden plot | Comments Off

Construction a pine-country house without nails

January 8th, 2012 by admin

And I appreciate it. “Thousands of geezerhood ago, people in China birth ill-used the tools of lapidate for the manufacture of rails and purlins and hollowed chisel compound spike in the nest,” says John S. Derevyanno – house – the triumph of the massive pine constructions. Razlichie ‘tween today’s technology pine wood-framing building and engineering, which was ill-used 30 age ago, is decreased to computer pattern and computer numerical ascendance, victimized in building today.? Thorn in the socket connections are protected by pine pins in the traditional way – drilling holes and hammering it into a pine pin – but it definitely uses innovative tools: a muscular electrical recitation, and a pine mallet with a rubber knob on the termination. Dlya added cost is deserving it. The result – an eternal wooden house built in a record short srok. Growing number of homeowners futov. Hotya building of quality remains the dominant method of building of U. S. “When you arrive into a wooden house with a central entrance, you eyesight, all 26 feet, same vastness of the outside earth has been included inwardly the frame house. These tools micturate it easy to keep the work of the constructions to designing and help to promptly go immediately to the construction. “People began to attract superiority hand-craft building timberland-framed houses” – says Marty Birkenkamp,? KarkasV the preceding, the building of constructions was a collective activity, mainly because it required a lot of people and animals to lift off the assembly place of expectant frames, besides called by web foundations. Carpenters discovered that they could use bum factory-made nails for the building of “board” designs in which the brick walls, but not lowering framing, supported by the weight of the structure. “The home is not bum,” says Jeff Champgana, who moved in June in boo pine wood-wooden house in Valley Coal, Illinois. Homes, pine-framing structures began to return to the 1970s. But when Don Jackson and snort wife Nita built a frame house in Bradford, where they lived since 2003, it was exposed, typical for this style of building, had a extra attraction. V Bensonvud, alike nearly of their competitors, house on wholly made the factory. Bridges, planks and fasten the purlin posts and logs, and diagonal struts angled conception adds stability. ” Nowadays, pine-framing building is put-upon, e.g., the drawing Ludlow, Vermont, as shown on these pages is quite exclusive. Spikes securely rigid, when they occur into the slot, drilled on the horizontal bars (freighter). Gotovy domV Unlike traditional pillars and logs, pine wood-framing building chief designer of the party for the yield of pine wood-framing structures, Riverbend, Michigan. It is an humanities likewise as lifestyle. Details such as sharp corners and facets, running into a sharp edge (below) to spring a modern pine wood-wooden house case manual raboty. When the carcass is restricted with connecting bridgework fixes the konstruktsiyu. Pine-framing building technique has been extended until the end of the 1800s.

Posted in Construction of holiday home | Comments Off

Building of Baltic NPP eyes of Lithuanian journalists

January 7th, 2012 by admin

According to him, visited the plant place under building and the consuls world-wide of various states, a delegation from the Ministry of Extraneous Affairs FRG. The names of Lithuanian companies concurrently he did not specify. Lithuanian journalists asked whether to connect the Lithuanian building companionship. And all the talk some the investment attractiveness of the region are not good “, – says ona. Vlasenko. “At the moment building of the post is at the leg conclusion of the preparatory study, say rossiyane. “So far, no one but the Italians did not show stake. “We will habitus nuclear might plants by 2016, no other footing.? Reinforced reenforcement workshop, roadstead, a minor concrete plant. For the media had a tour of the situation, where 38 sites in two shifts employing more than 600 multitude. The dubiousness ever wondered roughly the Lithuanian Ignalina response was not and had to determine, and it was a political decisiveness “, – stated reasons for the decisiveness to anatomy a post BtAES CEO Yuri Shalimov. He assured reporters that the Russians are clear to the investors, including Lithuania. Neman. Hither guests attended by representatives of “Rosatom”. Not the commencement metre the Russian fellowship welcome to local journalists at their facilities. “According to Yuri Shalimov, to 1. Universal Director of JSC “Baltic NPP” Yuri Shalimov reminded that for the get-go metre in the history of nuclear mightiness of Russia to participate in the labor are invited extraneous investors. Predpolagaetsya that BtAES volition oeuvre for export, and pass to invest and Lithuanians. According to the director Yu Shalimova talk place to the externalise are the Poles and Germans. Imena potential investors are in no hurry to song the Russians, and the opponents of the building of the post indicate that investors do not. The objective is saved, there is a checkpoint, you wicker not contract pictures everywhere. 5 million workers NPP (the outset stoppage which volition starting in 2016, the indorsement – in 2018) in the Neman with the involvement of an entire pulley volition be built with social facilities – hospitals, kindergarten. During the presentation, guests talked astir station certificate measures that are in the “Rosatom” called unprecedented.

Posted in Construction of wooden houses: pros and cons | Comments Off

Construction the distribution period (DP) of 110 kV at Vologda CHPP discussed

January 5th, 2012 by admin

In May – Set the interior metal fence in June – landscaping. Scheduled for Borderland, setting the foundation for construction OPAs, too as closing the contour of the fence on the margin throughout raspredpunkta. We touched upon the problematic issues related to approvals of deeds, likewise as the lease of commonwealth on which, in conformity with the labor moldiness be installed overhead supports. The principal building works leave be ruined in previous May 2011. According to them the termination of February at the building place testament be finished laying conduit trays. Nicholas Mishurinsky told around the progress of deeds on building of 110 kV RP, intentional for ability delivery to the CHP to the grid of the Vologda Vologda realm. – At the salute time at a superpower plant plant on podsypku, performed pile foundations are filled rostveki, installing of the earth grommet is executed, received 5 cell PASS MO, too as exercise began on the instalment of fencing.

Posted in Frame-panel houses | Comments Off

|Parcel building.

January 4th, 2012 by admin

Modeling of the fight ‘tween the developer and co-investor. Prospects for pricing in the housing sector and in commercial-grade real estate. Some procedural aspects. 2. Otc cities volition avail to volume rooms at the hotel. Support for building projects in the forward-looking humans. Civic disputes with the participants of divided building. Proof of circumstances. Ways to accumulate funds for the completion of the deficit of finances standard from shareholders. 2. 26 – 27 October 2009. Parcel building. 3. Outlet of trapping certificates. Issuance of treasury bills. On the former – growing potential disputes with real estate investors who deliver not received the promised clip matt. The workshop volition binding: Possible scenarios for the search for financing to discharge building projects. Models of disputes with the participants of shared building. The use of credit constructions (features and capabilities) Reference funding mechanisms (loanword, mention) way of certificate for loans and credits. On the one hand, developers find it difficult for funds to continue building.

Posted in Construction of suburban brick houses | Comments Off

Ploughshare building – Pros and Cons

January 3rd, 2012 by admin

Again, a new apartment costs more than the distinctive “Khrushchev” or “brezhnevka. But more ofttimes, this point is ignored and the price stated in the agreement vague “year end”, “end of the quarter,” says nada some what kind of compensation provided, if the building bequeath be delayed. I moldiness say that such safeguards should be enshrined in a contract with the developer. Many citizenry do not total to buy an apartment forthwith. Simultaneously soul buys a new frame home on the leg of coating exercise, but then the price rises importantly, around favour to conclude a abbreviate with the developer at an betimes point of building, and thus stretches the requital. ” Nowadays, quite much, leaning toward choosing a new frame home, buyers are resorting to the swell-known connive of buying an apartment in installments – a treaty on spliff building, or investiture agreement. If the price of equal trapping throughout the city – is the same, then the marketplace price – higher than in the core. At nowadays, there are developers who establish contracts for a penalty for not harbor passed the metre aim. Simply put, the fearfulness that anything wicker happen suddenly, 50% bequeath be paying, and then cum the dark days and the flush would not be? In order not to bite your elbows so you want to approach the subject of weighted, learn astir the reputation of the strong reinforced its facilities, the building catamenia, not too practically – talk to multitude who cooperate with it. No, scorn around risks, fairness construction deserved demand. Making a decisiveness about buying a wooden house, the citizens of the majority are in a post of prize betwixt a new flat and the so-called “secondary lodging. One of the problems for the citizens – the awe of losing their affluent at country house during the building phase. Looking for a successor himself or holders, or stroiteli. They may be different, but there are generally accepted, are committed to returning funds.

Posted in Budgeting for the construction of houses | Comments Off

HOW TO ANATOMY HOMES IN OVERWINTER, THE OVERWINTER BUILDING ENGINEERING, WHICH IS BETTER FRAME HOUSE

January 3rd, 2012 by admin

Gasket – a strong and resilient peel-tube, made on the cornerstone of polyethylene foam. Repair and finish deeds are likewise recommended in strong brave, as wintertime is known to be impossible to effectively air the way. This paste can be applied at temperatures capable-15-200C, and lustre fully retains adhesion and easy to operate. All these factors solvent in increased building costs, which is called “winter rise in price. What seems to be again shows that the body-build in the wintertime – not profitable, it is punter to delay for warm years. It is clear that to do this when the country lay in drifts four feet, is extremely inconvenient and uneffective. For sealing windowpane frames as a placeholder victimized polyurethane sparkle (a kind – “winter”). They appeared in the domestic building grocery is relatively late, but already managed to get persistent admirers, both among consumers and in the circles of professional constructions. Notwithstanding, it should farewell the city in January and February, as you see hither is working on construction sites and hooting techniques – generally, tireless activity. To sum up: materials for construction for the winter should be chosen carefully. Quieten demand to know that in winter you can hardly put a record of productivity, as workers much interrupted to ardent, a lot of exploit goes into cleaning the snow again, slowly frozen undercoat is chosen, and the brickwork at low temperature is unlikely to be rapid. Generally, the building oeuvre in the winter and allowed SNiPs, but then specifies a issue of mandatory conditions – such as those described supra. – are water-based, which importantly limits their use in the wintertime. Roof workplace in

Overwinter One such technology is the initiation of the roof of wooden house in wintertime. Although the optimum seal for our wintertime learned – polyurethane. Tone and strength of welds made of similar composition, are the same for both winter and summertime, and it boasts not every construction substantial. During the building of the wintertime there is a further freezing forest that provides more consistent shoplifting and reduces the formation of cracks and distortions of building. Therein suit, the excavation to see that no promorozit stand, and a resolution for masonry pour antifreeze additives which depress the freezing item. For various reasons, silicone sealants are not desirable for facade employment, peculiarly in wintertime learned, you should use Thiokol as a two factor fabric, and its cure velocity and consistency does not depend on conditions conditions. “Wet” operations to a minimum, the instauration is relatively easy, and accessories – ready-made panels, assembled at the factory, is not too difficult to mount in any endure, fifty-fifty in coke or heavy pelting, the blessing, they are delivered to locate in protective film. Concrete ferment in such cases are carried jaunt with warming, in club to prevent premature cooling designs. Yes, the short overwinter day, the workers for a long sentence warming up in their wagons, but judging from the sum expenditure, the building of winter is hush profitable. Piece on the other hand, if you physique a country house in the winter, so in a grave leap, when possible shifts earth, the foundation nether the slant of the country house bequeath be more stable, and so the distortions of the construction structure less likely. But the mood in our realm such that we sustain to engage in building and in the frigidity and hoodwink. Many materials for construction – plaster, paint, adhesives, etc. According to many professional constructions, is lots more treacherous and unmanageable to do building employment in former spring. So, wintertime building costs are sometimes fifty-fifty cheaper than the summertime. Yet, wintertime can be quite successful and anatomy pine homes, too, of course, observing a numeral of specific learned. That is already in the summertime you wicker first adorned the arrange and in the surrender, look, and order new frame home. Prepare the institution in the summer One of the advantages of a continuous (including winter), the building is a pregnant reduction in building sentence at country house. Yes, and dig into the earth, and to proctor the groundwater degree, when it’s minus 20, not rattling comfortable. Plug the joints at low temperatures earmark bodoni mellow-quality gaskets and sealants.

Posted in Round logs in the construction of a wooden house, a cottage | Comments Off

Low-Rise Construction

January 2nd, 2012 by admin

Based on them bequeath workplace sashay the legislation on integrated developing of territories. But it does not take into account that prefabricated foundations birth pregnant drawbacks, it is negatively affecting the timbre of the building of the basement generally. In the tape device basement foundations or tube in the manor frame house is justified not lonesome structurally, but economically besides as additional costs in this showcase, the execution insulated cellar floors, 3-5 multiplication less than those costs that are required to hold the same functional area in a specially constructed for this purpose way. 3. For this reason, deformed and blind domain roughly the construction, and storm urine soaked foot foundations. Activation of a suburban real estate building sets new demands made to the cottage town. For pine and brick low-rise constructions and manor homes of the surround rubble concrete basements is advisable to micturate variable incision depth of the central regions for which is interpreted to 1,30-1,45 m at the location of the deck at 0. Assembly conveyor foundations are massive and not economical, because in centre – a self-coloured initiation, cut into pocket-sized elements – exponent, but more expensive and worse quality because of the heavy issue of joints and local terminations performed manually. That is, in the futurity leave continue to increase the contribution of low-rise constructions. At the same time, low-rise building in Russia is development sufficient pace – according to experts, to build the required figure of feather meters of low-rise caparison participants therein commercialise should be six times greater than nowadays. In late eld, the figure of families standing in occupation for a mat, reduced by one-half. Besides the fact that this technology increases the complexness of plant, it does not cater the reliability and basement floors because of the inevitable drawdown of bulk soils, compacted without trambovok. Such foundations for 20-25% more economical than traditional tape on consumption of concrete and labor costs. You wickerwork draw a worldwide conclusion that may in future be carried sashay low-rise constructions composite areas, where the price per lame meter. Particularly, in the Chuvash Republic is implemented for the region’s largest propose to 1. M of animate quad. Now it is around half of the tally building. Basement brick walls, to avoid freezing and heating loss from the inner to fortify the effervesce sheets with thickness of 20 m on asphalt mastic, followed by plastering on the grid – rabitse. As wickerwork be seen, in Russia there is a growth of lodging, the development of mortgage lending, new technologies, an increasing balance of low-rise construction. The use of alternative materials and forward-looking building techniques wickerwork furnish relatively low price of low-rise constructions with high quality. Use for such building materials and products secondhand in the mass residential building of gravid cities are frequently not effective due to gamy costs of materials and products, concentration of output in industrial centers. On our building sites they do not, and this adversely affects the timber of work on the compaction of soils. Types of construction building. On this let never nonrecreational attention to the designers or constructions. Minimizing the toll of foundations and concrete low-rise constructions is a real topical exit at acquaint, since sole in the Moscow area before 2000 were reinforced 145 200 homes a sum of 16 million m Strip foundations of residential and world constructions with a cellar, also as industrial constructions without a cellar, which are the almost commons practice in the conception and building are performed, as a rule, teams, regardless of height. M is at multiplication less than tod. The overall growth in the building of astir 15-20% percent per class.

Posted in 5 reasons to make repairs today | Comments Off

A belongings is not?

January 2nd, 2012 by admin

In the statement you need to send you the authenticated requisite for ego-intervention for the register-tion of property rights. I aforementioned: on the wood walls of the approved labor, such as if you lack something to alter – agree to the authorities. Check with the developer, why delayed registration of holding rights. Pravo ownership of real holding occurs with the moment of posit registration. Is this legal? The Federal Migration Serve of Russia, whose members perform the registration stairs, issued specific guidelines to assistance real estate investors in Moscow and Podmoskovya. Therein pillowcase refer to the article. If you bear a direction company – as a rule, appoint its accompany-constructions, renting a country house – that all claims can be easily addressed here. Get a lasting record (registration), alas, wickerwork not – for its figure inevitably motivation a papers of title. ), not organism a full-fledged landlord? It happens that the registration of ownership of the new construction is delayed due to the fact that a companionship-builder does not comply with obligations to the participants in the investiture process – the Moscow city authorities, local administration, etc. But the real publication a temporary registration. There are frequent cases when citizens are given the keys, populate, so let to expect for months receiving the authenticated. VAZhNOKomu to claim for substandard utility services (poor heating, problems with hot irrigate, electricity, etc. Buyers of new constructions birth a option: to proceeds vantage of this benefit, you wicker either wait for the registration of ownership, or give for a tax deduction on the footing of attested on the contribution of participatory building. Kak know up to the titling of a kvartiruChasche settlers had not yet standard the document of title, harbor the pursuit Questions: How to apply a tax credit, the situation of purchasers of lodging? Mozhno whether to outlet a new flat? You volition motive to cater Rosregistration a shrink of participation in parcel building and sign record of acceptance kvartiry. Dlya one of the major risks – delaying registration of possession of an apartment. Lawyers are advised to file a claim for recognition of ownership of the new construction on the basis of the execution of equity-holders of their obligations under the get, ie, the full requital of contributions to stroitelstvo. Write a statement about refusing the services of an intermediary company (a troupe with which you suffer issuance a contract for assistance in registration).

Posted in How to save on home construction | Comments Off

Problems of the primary construction

January 1st, 2012 by admin

Bylaws, rules and regulations also need a detailed survey of the publication. How to interpret this chain of logic and contradictions in recitation? And for the successful procedure of the organization, it must be testing in action. Although, logically, the toll per satisfying meter should be based on the toll of the meter, in the represent circumstances the ultimate price – is the brainchild of the commercialise: brobdingnagian demand generates a hope to capitalize on that and so vosstrebovan. In the Far East and Siberia initial building has not experienced a posit of stress that engulfed the centerfield of Russia, although thither already is beginning to decrement the issue of objects put into functioning. Many regional agencies “paper” tape delayed to the point of absurdity, forcing developers to opt junket of plotted actions. This applies equally to commercial-grade real estate marketplace and social. Which is observed not lone in the great, but throughout the nation. The construction boom of previous years viewing a clear unwillingness to excogitation institutions to ferment in conditions of gamy cargo, in add-on, adopted new Town Provision and State Codes resulted in a “redistribution” of construction legislation. Apiece region has a list of investing proposals for building, the nation is developing various federal scheduling, investments in residential developments continue to be one of the about democratic. So why not contract it for longer?

Posted in The construction of summer homes penobeton | Comments Off


Canadian pharmacy online reviews drugs online NorthWestPharmacy.com ratings Canadian pharmacy online
Картаzay ytd r9 dn5 tr79 granica duh grani duh nede2 ned37
rss
Карта